It's also the length of time until my cabinets will be going up. :) :) :)
The plumber was here yesterday, and did some much needed work. Our sink will no longer drain through our cabinets; it now goes straight down into the basement. Pics to follow. They also jury-rigged the old sink on top of the new base cabinet, so I'm not lugging dishes up and down the stairs to wash them in the tub.
I'm also in the midst of harassing the flooring store. We ordered our floor (online) in mid-August, were charged for it immediately, and we have yet to see it, despite several calls to them. Not pleased at all with them, at the moment. UPDATE: Harassing successful. Floor will arrive this week, as will the carpenter to move and widen the door into our dining room.
0 spoons thrown:
Post a Comment